Tuesday, April 11, 2017

Window Blinds: Do you need any?

An owner here at 900 Marshy Cove has a complete set of window blinds available. The blinds are from a Dorchester Unit.  Given their good condition, he would hate to trash them..
Will they fit other units' windows? Maybe, It's worth checking.

  • One set is the double wide for the second bed room
  • The other four are for the other four single wide windows
Bruce M can be contacted by email at mc900@comcast.net

~~~~~~~~~~~~~~~~~~~~~~ 
DH Pool Opens Memorial Day weekend! 
See you in the shallow end.
Wrist bands available at Sentry.


Marina Boat Slips

Marina Boat Slips:
I often get requests regarding the availability of slips for sale, purchase, or rental in the Deep Harbour Marina.


  • Steve H would like to purchase a Boat Slip. 
  • Seth B would like to rental slip for the month of June.

If you can help either of these DH owners, please contact me at mc900@comcast.net
or 
I will pass your contact information to them.

The map below shows boat slips that have been empty in green in previous seasons,  Some have changed hands,




Thursday, April 6, 2017

Back to Expansion tanks

Here's a video on Youtube regarding the proper installation of an expansion tank.


or 




Comments? Questions? send them to mc900@comcast.net

Deep Harbour Master Association! BOD Meeting Notification

Deep Harbour Master Association

Regular Meeting of the Board of Directors

April 22, 2017, 10:00 AM 
Sentry Office
601 Locust St 
Suite #302
Cambridge, MD 21613

Key Issues:
  • Pool Management
  • Street Lights
  • Streets and curbing
  • Landscaping
  • Construction Defects Study
  • Pet Policy
Your attendance is encouraged.

You may also submit your questions and concerns to 




Cruising the Choptank

SAVE THE DATE! Annual Meeting of Members, Saturday, May 13, 2017

SAVE THE DATE! 
Annual Meeting of Members, Saturday, May 13, 2017

To all Unit Owners at 900 Marshy Cove,
On May 13, 2017, the Council of Unit Owners will meet for our Annual Meeting. You will receive a mailer with the meeting agenda. The most important item is the election of directors. This year we will need to elect three directors. Two of the director positions will be for full three (3) year terms ending in 2020. The third position is a replacement which will be up for re-election in 2018.  
It is imperative that we establish a quorum at our Annual Meeting to validate the election process.  This can be done by attending the meeting or by submitting a proxy. Enclosed in the mailer are the necessary forms.
We encourage your involvement in our Association. Nominations for director positions are open to any owner who desires to serve.

Reminders:
·        All rental agreements must be filed with Sentry Management
·        Complete you contact information form and return it to Sentry
·        Return your completed proxy and nominations forms if you cannot attend the Annual Meeting on May 13, 2017

Annual Meeting of Members, May 13, 2017
Time: 10:00 AM
Sentry Management
601 Locust St #302,
Cambridge, MD 21613.
Phone: 410-221-0398       (410) 221 - 9977 (fax)
Thank you for your cooperation,
900 Marshy Cove Board of Directors
George B- President     MC900@comcast.net
Alan M – Vice President
Leo E – Treasurer
Shirley M- Secretary
Hamilton C - Director

       When did you last attend?


Tuesday, March 7, 2017

ENERGY: Gas savings February 2017, new heating controls

All, The first results are in the bank. More to come.

Situation:  The space above the garage ceiling contains various pipes for fire suppression and other services.  It is heated by a gas hot air system.

A hard look at our 900 Marshy Cove expense reports showed unreasonably high gas consumption in March, April, and May. Why? It was discovered that the heater was running continually at full blast producing bills of $800-$900 per month.

The original controls installed by Beazer’s contractor were simplistic and eventually malfunctioned.
~~~~~~~~
Pliescott HVAC installed the new heater controls for the garage ceiling on February 2 at a cost of $721.00.
February 2017, 235 units, 8.1 per day, $363.62, average temp= 42, (29 days)
January 2017, 737 units, 22.7 per day, $1096.43, average temp= 41, (33 days)
February 2016, 626 units, 22,3 per day, ---------, average temp= 37, (28 days)
Savings from January(33 days) to February(29 days)= $732.70
 or 22.7- 8.1 units per day = 14.6 units per day or about $20.60 per day
~~~~~~~~~
How it works:
  • A wireless temperature sensor is located in the space above the garage ceiling
  • A second wireless temperature sensor is located in the garage below the ceiling
  • The temperature in the garage must be below 45 degf to enable the heater.
  • If the temperature in the garage goes below 45, the heater works to keep the ceiling space at 65 degf.
~~~~~~~~~
Other costs savings: Elevator Sequence of Operation
Last year, we changed the elevator sequence of operation.
Now the elevators do not return to the lobby after every trip.
Elevator cabs now remain at the last floor until called again.
This eliminated some wait time and empty trips from the lobby.
It was a simple control setting change by Schindler.
Empty trips from the lobby to the upper floors cost energy.
We haven’t been able to determine the energy savings yet, but, it is there.
There should also be some maintenance savings over the long term.

~~~~~~~~
We are also changing all light bulbs in the building to LED's.  All of the hallway wall lamps were previously replaced with LED's saving us approximately $5000 per year.
~~~~~~~~~~~

Regards, 900 Marshy Cove's Board of Directors



Wednesday, February 22, 2017

What does that place across the Creek do? Big Lou?

Cambridge Marine Terminal Railway


            The Cambridge Marine Terminal Railway, located at 301 Cemetery Ave., Cambridge, MD on Cambridge Creek, has served the Department of Natural Resources as its major marine repair facility since 1974. This State owned facility has the only railway and dry dock system capable of hauling vessels up to 120 feet in length and weight displacement of 200 short tons.  This centrally located railway is in heavy demand year round and is essential for keeping DNR’s fleet of vessels operational, safe and well maintained.  The recently completed project replaced the aged and deteriorated railway after 34 years of extensive use.  Structural problems had developed through gradual deterioration in the timber rail system.  Inspections and test results concluded the system which was rated for 100 tons was not safe to operate and in 2006 operations were ceased.


            An all steel railway system and cradle was fabricated and installed on a new pile foundation.  This will facilitate vessels 150 feet in length and weight displacement of 200 short tons.

            DNR’s Marine Construction Division operates the railway, and the vessels they maintain are large steel haul barges and tug boats used in the construction of piers, bulkheads, stone jetties, public boat ramps and dredging of channels.  Natural Resource Police vessels are used for law enforcement and setting navigational buoys channel markers.  Other larger steel haul vessels maintained at this facility, such as the Big Lou and Widener, are used for ice breaking operations during the winter months to keep channels open and safe for commercial waterman while harvesting seafood.  These vessels also collect floating debris in the Chesapeake Bay and its tributaries, which may cause a navigational hazard.


            The Cambridge Marine Terminal Railway also assists NOAA’s research vessels based at the Oxford Cooperative Lab, state and county agencies needing assistance and emergency hauling.  Although not open for public use, privately owned vessels in distress or sinking, which may result in a fuel or oil release into the water, will be considered for extraction.


Big Lou breaks-up ice on the creek (01-2014)

NOT this Winter
Many thanks to the 
Department of Natural Resources 
for this information.

Tuesday, February 21, 2017

ALERT! Message from Sentry Management

ATTENTION ALL RESIDENTS:

We’ve had reports of one stolen vehicle and multiple vehicle break-ins with valuables stolen in several communities this week.
***
Thieves are out and they’re looking. Don’t be their next victim. Please remove valuables from your car or store them safely out of sight and secure your vehicles, garages and homes at all times. 
***
It helps to leave porch lights on all night, too.
***

Last but not least, if you see something, say something. To report a crime or suspicious activity please call Cambridge Police at 410-228-3333 immediately.

Sentry Management

Sentry Management Inc
601 Locust St, #302
Cambridge, MD 21613
(410) 221-0398
(410) 221-9977 (fax)

Sunday, February 19, 2017

DNR completes Rail Lift for large vessels


In case you have been wondering what has been going on across the creek.
The DNR has been rebuilding the rail lift ramp that will enable them to service their fleet here in Cambridge.  
The project started last summer when the ramp was partitioned with temporary steel pilings.
The water was pumped out creating a dry work space.  The original wooden pilings an rails were replaced. In the past three weeks, the large crane returned to remove the steel pilings. 

Response to an email sent to the DNR
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Dear Sir:

Thank you for contacting the Maryland Department of Natural Resources regarding the work in Cambridge Creek.

The department's Engineering and Construction Unit has replaced the railway that we use to pull boats out of the water for repairs. The next phase of the project includes replacing the bulkhead. This a very important facility for the department because we use it to house equipment and materials, including our ice breaker.

Thanks again for writing the department. If you have any additional comments or questions about the project, please contact Jordan L. at the Maryland DNR

Thanks,
Stephen
MD Logo.png

facebook_logo.jpg twitter_logo.jpg
Stephen E. Schatz
Director, Communications
Department of Natural Resources
580 Taylor Ave., D-4
Annapolis, Maryland 21401


It appears that the work is done.
The DNR Ship Maintenance Facility. Big Lou, the tug, is docked above the rail ramp.


The large crane needed to place and remove the steel bulkhead pilings heads out to the Choptank

A tight fit, a slow approach held up street traffic for 20 minutes


Safely on the north side


Sunday, February 5, 2017

Regular Meeting of the Board of Directors, Saturday, February 11, 2017

Regular Meeting of the DHMA Board of Directors
February 11, 2017; 10:00 (AM)
Offices of Sentry Management Co., 3rd floor
601 Locust St., Cambridge, MD   21613

1.    Call to Order (opening time: _________)
a.    Roll call, attendees
 2.    Board of Directors
a.    Proof of quorum
3.    Approval of December 10, 2016 Meeting Minutes
4.    Officer Reports
a.    President’s Report
b.    Treasurer’s Report
                                          i.    YTD expenditures verses budget
                                        ii.    Reserve recommendations
                                       iii.    Allocation of operating and reserve funds
iiii – Bank signature cards 
5.    Sentry Management Report
a.    Street lighting status –Return of LED-LLC bulbs
            -Repair o damaged street light
b.    YMCA pool contract
c.    Marshall landscaping contract
d.    Marshall snow pushing contract
e.    Sentry contract
f.     Waste Management trash removal contract
g.    Gate Maintenance

6.    Committee Reports
a.    Landscaping Committee
 7.    Old Business
a.    Voting Status of TH5
b.    Gate lawsuit
c.     Developer Transition- defects study
c.    Roadway top coating.
d.  Broken Bench near marina
8.    New Business
a.    403 Aurora St - boat repair business
c.    Pet Policy

9.     Resident Forum


10.   Adjournment (closing time: ___________)