ARK Fire Systems will begin work on our Attic Sprinkler system on Monday, May 3.
You should have noticed the galvanized pipe stored on the West side lawn.
Work will continue for four to five weeks.
This is difficult work. All of the pipe in the attic will be removed and hauled off.
The workman will need to carry all the pipe by hand up and down the stairway.
During the workday, the fourth-floor residents will hear footsteps as the workman walk the rafters.
The end result will be a properly pitched piping system that will properly drain water after testing. Galvanized pipe should extend the life of the piping for many more years than we have experienced to date.
Hopefully, this will eliminate false alarms caused by pin-hole air leaks in the system.
~~~~~~~~~~~~~~~~~~
Reminder: Annual Meeting of Owners, May 8, 2021, 10:00 AM.